Keep track of every box placed in temporary storage and every fixture or finish purchased for the rebuild.
Plumbed fixtures often arrive 3 months before they get installed. Log them in the "Garage" when they land so you don't panic on install day.
Snap a photo of the under-sink plumbing and the specific water filter model, store it within the "Kitchen" node, forever easily accessible.